Discover the Quick and Efficient Process of PUF Panel Installation for Superior Insulation & Durability

Admin
July 29, 2025

July 29, 2025
India’s construction and cold-chain sectors are embracing PUF sandwich panels because they offer rapid installation, exceptional thermal performance, and long life—even in steamy coastal zones or dust-laden interiors. Polyurethane’s closed-cell foam core locks moisture out while keeping chilled air in, cutting compressors’ run-time and protecting perishables or process lines from temperature shocks.
BIS IS 12436 caps thermal conductivity at 0.023 W/m·K at 10 °C for rigid PUR/PIR foams, beating mineral-wool or EPS alternatives.
Finished densities of 38-42 kg/m³ let crews handle 4 m × 1 m wall panels without cranes, speeding jobs and reducing structural steel.
Prefab panels typically trim site schedules by 30-50 %, a saving highlighted by Indian prefab suppliers who note that “installation time is akin to money.”
The foam’s closed-cell matrix repels water vapour, and metal facings meet Class 1 surface spread of flame—key for FSSAI-regulated food sites.
The domestic sandwich-panel market is expanding at 11.4 % CAGR, set to double to ₹3,800 crore by 2031 as logistics parks, data centres, and EV-component factories chase green-building credits.
India’s cold-storage segment alone is projected to top US $26.5 billion by 2035, powered by government PLI schemes and e-commerce grocery demand.
Yet current capacity is only 30 million tonnes, so rapid-erect PUF rooms are essential to hit the 200 million-tonne target by 2030.
Stage | Key actions | Time & tool tips |
---|---|---|
Site preparation | Level RCC slab, mark chalk lines, and install galvanised ‘C’ channel starter tracks. | 4 hrs for a 100 m² room; laser level ensures ±2 mm flatness. |
Panel handling | Off-load bundles near work‐face; keep under tarpaulin if temperature > 40 °C. | Lightweight panels (< 15 kg m²) need only 3 labourers. |
Wall erection | Stand first corner panel plumb, interlock adjacent panels via cam-locks (8 mm Allen key) every 1.2 m. | Two installers can lock ~75 m² per shift. |
Openings & cut-outs | Jigsaw cut door/window apertures; flash bare edges with PPGI “C” channels and silicone. | 15 min per opening. |
Ceiling placement | Seat roof panels onto wall notches; brace spans > 4 m with GI hangers. | Complete 100 m² roof in 3 hrs. |
Sealing & finishing | Apply antimicrobial silicone to all joints; inject PU foam at floor-wall junctions to kill thermal bridges. | Adds 5 % to material cost but saves 10 % energy annually. |
QA/QC | Thermal imaging to check for cold spots; pull-test fasteners to 0.5 kN. | Final inspection < 2 hrs. |
Total build time for a 10 m × 10 m × 4 m cold room: ≈ 48 hours, including QA—half the time of brick-and-mortar plus spray PU.
Thermal code compliance: Panels satisfy IS 12436 for conductivity and closed-cell content.
Wind & cyclone loads: Proper screw spacing (150 mm edge, 300 mm field) withstands ≥ 180 km/h gusts common on the Konkan and Coromandel coasts.
High humidity defence: Factory-applied plastisol/PPGL facings and vapour-tight joint sealants prevent delamination in > 90 % RH zones like Kochi.
PUF walls deliver service lives beyond 25 years when periodic gasket checks and gentle detergent washing are observed—no repainting or re-plastering needed. Routine IR scans each pre-monsoon season quickly flag insulation breaches before they raise compressor loads.
Item | Typical value* |
---|---|
Material cost (50 mm PUF wall, 100 mm roof) | ₹1,300–1,600 /m² |
Labour & hardware | ₹250–350 /m² |
Energy saved vs. un-insulated sheet shed | 30–40 % annually |
Payback period (cold store @ ₹9 kWh) | 2–3 years |
*Average of Viraat, EPACK & Omkar price lists May–July 2025.
RINAC pioneered modular PUF technology in India three decades ago and today offers:
In-house design to commissioning: Cold rooms, ripening chambers, cleanrooms.
PIR fire-safe options: Tested to 90 min integrity for pharma warehouses.
Pan-India service: 24×7 spares depots in Gurgaon, Pune, Bengaluru, Kolkata, and Kochi.
Green credentials: Zero-ODP pentane foaming, solar-ready roofs, IGBC & GRIHA documentation support.
Ready to slash build times and energy bills? Talk to a RINAC engineer now and request a site-specific PUF installation plan.