Discover the Quick and Efficient Process of PUF Panel Installation for Superior Insulation & Durability

Discover the Quick and Efficient Process of PUF Panel Installation for Superior Insulation & Durability

Author
Admin

July 29, 2025

Blog

Discover the Quick and Efficient Process of PUF Panel Installation for Superior Insulation & Durability

India’s construction and cold-chain sectors are embracing PUF sandwich panels because they offer rapid installation, exceptional thermal performance, and long life—even in steamy coastal zones or dust-laden interiors. Polyurethane’s closed-cell foam core locks moisture out while keeping chilled air in, cutting compressors’ run-time and protecting perishables or process lines from temperature shocks.

1. Why PUF Panels Are a Smart Choice for Indian Projects

1.1 Best-in-class thermal insulation

BIS IS 12436 caps thermal conductivity at 0.023 W/m·K at 10 °C for rigid PUR/PIR foams, beating mineral-wool or EPS alternatives.

1.2 Lightweight yet strong

Finished densities of 38-42 kg/m³ let crews handle 4 m × 1 m wall panels without cranes, speeding jobs and reducing structural steel.

1.3 Faster payback

Prefab panels typically trim site schedules by 30-50 %, a saving highlighted by Indian prefab suppliers who note that “installation time is akin to money.”

1.4 Moisture, fire & pest resistance

The foam’s closed-cell matrix repels water vapour, and metal facings meet Class 1 surface spread of flame—key for FSSAI-regulated food sites.

2. Indian Market Snapshot

  • The domestic sandwich-panel market is expanding at 11.4 % CAGR, set to double to ₹3,800 crore by 2031 as logistics parks, data centres, and EV-component factories chase green-building credits.

  • India’s cold-storage segment alone is projected to top US $26.5 billion by 2035, powered by government PLI schemes and e-commerce grocery demand.

  • Yet current capacity is only 30 million tonnes, so rapid-erect PUF rooms are essential to hit the 200 million-tonne target by 2030.

3. Step-by-Step PUF Panel Installation (Indian Site Conditions)

Stage Key actions Time & tool tips
Site preparation Level RCC slab, mark chalk lines, and install galvanised ‘C’ channel starter tracks. 4 hrs for a 100 m² room; laser level ensures ±2 mm flatness.
Panel handling Off-load bundles near work‐face; keep under tarpaulin if temperature > 40 °C. Lightweight panels (< 15 kg m²) need only 3 labourers.
Wall erection Stand first corner panel plumb, interlock adjacent panels via cam-locks (8 mm Allen key) every 1.2 m. Two installers can lock ~75 m² per shift.
Openings & cut-outs Jigsaw cut door/window apertures; flash bare edges with PPGI “C” channels and silicone. 15 min per opening.
Ceiling placement Seat roof panels onto wall notches; brace spans > 4 m with GI hangers. Complete 100 m² roof in 3 hrs.
Sealing & finishing Apply antimicrobial silicone to all joints; inject PU foam at floor-wall junctions to kill thermal bridges. Adds 5 % to material cost but saves 10 % energy annually.
QA/QC Thermal imaging to check for cold spots; pull-test fasteners to 0.5 kN. Final inspection < 2 hrs.

Total build time for a 10 m × 10 m × 4 m cold room: ≈ 48 hours, including QA—half the time of brick-and-mortar plus spray PU.

4. Meeting Indian Standards & Climate Challenges

  • Thermal code compliance: Panels satisfy IS 12436 for conductivity and closed-cell content.

  • Wind & cyclone loads: Proper screw spacing (150 mm edge, 300 mm field) withstands ≥ 180 km/h gusts common on the Konkan and Coromandel coasts.

  • High humidity defence: Factory-applied plastisol/PPGL facings and vapour-tight joint sealants prevent delamination in > 90 % RH zones like Kochi.

5. Durability & Maintenance

PUF walls deliver service lives beyond 25 years when periodic gasket checks and gentle detergent washing are observed—no repainting or re-plastering needed. Routine IR scans each pre-monsoon season quickly flag insulation breaches before they raise compressor loads.

6. Cost & ROI for Indian Owners

Item Typical value*
Material cost (50 mm PUF wall, 100 mm roof) ₹1,300–1,600 /m²
Labour & hardware ₹250–350 /m²
Energy saved vs. un-insulated sheet shed 30–40 % annually
Payback period (cold store @ ₹9 kWh) 2–3 years

*Average of Viraat, EPACK & Omkar price lists May–July 2025.

7. Why Partner with RINAC for Your Next PUF Project

RINAC pioneered modular PUF technology in India three decades ago and today offers:

  • In-house design to commissioning: Cold rooms, ripening chambers, cleanrooms.

  • PIR fire-safe options: Tested to 90 min integrity for pharma warehouses.

  • Pan-India service: 24×7 spares depots in Gurgaon, Pune, Bengaluru, Kolkata, and Kochi.

  • Green credentials: Zero-ODP pentane foaming, solar-ready roofs, IGBC & GRIHA documentation support.

Ready to slash build times and energy bills? Talk to a RINAC engineer now and request a site-specific PUF installation plan.

© Copyright Rinac | All rights reserved | Designed and Developed by: Hyrrokkin