Cost Calculator: Prefab vs Brick & Mortar

Cost Calculator: Prefab vs Brick & Mortar

Author
Admin

May 27, 2025

Blog

Why bother with a cost calculator?

Hidden costs decide ROI, not sticker price. A brick wall that looks “cheap” at ₹90 /sq ft can push refrigeration bills up by 30-40 % for 20 years.

Speed-to-revenue matters. Every week your facility opens early is a week of produce saved, SKUs shipped, or vials validated. Prefab builds 30-50 % faster.

Lifecycle ≥ construction. PIR/PUF panels last 25-30 years with wipe-clean maintenance; masonry needs repainting, waterproofing and crack repair every 5-7 years.

 

Step-by-step cost calculator framework

Input Prefab best-practice (Default) Brick & mortar (Default)
1. Envelope cost/ sq ft ₹450 (100 mm PIR, colour-coat steel) ₹1,950 (9″ brick + RCC columns, plaster, paint)
2. Build time 4 months (10,000 sq ft cold store) 8 months
3. Refrigeration load (TR/ 100 m²) 55 78 (+41%)
4. Annual kWh 480,000 690,000
5. Energy cost (₹/kWh) User input (default ₹8)
6. O&M (% of capex/ yr) 0.5% 2.5%

Formulae

  • Capex = Envelope × floor area + HVAC + floor & services
  • Lost revenue = Daily GM × (delivery delay days)
  • Energy (₹/yr) = Annual kWh × unit cost
  • Lifecycle cost (20 yr NPV @10 %) = Capex + Σ(energy + O&M – tax shield)

Replace the grey cells and the sheet spits out Payback-in-months and 20-yr NPV delta for prefab vs brick.

 

Key cost drivers unpacked

1. Building shell

Prefab: 100 mm PIR panel wall/roof gives U-values around 0.28 W/m²K and cuts heat ingress by ~82 % vs 150 mm brick without insulation

Brick: Needs 75-100 mm external insulation or cavity wall to reach ECBC U-factor of 0.261 W/m²K; rarely installed in industrial budgets.

2. Time = money

Factory-made panels and bolted steel frames slash on-site labour; studies show 40 % faster schedules (and even 2× in Tata Steel Nest-In projects)

For a 10 000 sq ft ripening hub earning ₹2 lakh/day GM, four months saved equals ₹2.4 cr opportunity cost avoided.

3. Energy & refrigeration

PUF/PIR cores (λ ≈ 0.022 W/mK) trim HVAC energy 30-40 % and, in a World-Bank/BEE study, paid back in 3-5 years for apple, grape and mango pack-houses .

A 5 000 MT cold store case cut wall heat load from 35 MWh to 21 MWh (-41 %) with 100 mm PIR

4. Maintenance & lifespan

Colour-coated steel skins resist corrosion; routine care is quarterly wash-downs and gasket checks. Expected life 25-30 yrs

Masonry requires crack grouting, repainting, damp-proofing—estimated at 2.5 % capex/year

 

Industry-specific snapshots

Cold-storage & 3PL warehousing

A 20 000 sq ft PIR-panel warehouse recoups extra envelope cost in 2.1 yrs via energy savings and rental income acceleration.

Food & beverage processing

HACCP grade finishes (steel skins, concealed fasteners) avoid plaster flakes—saving ₹4 lakh/year on product recalls and downtime.

Pharma & life-science clean-rooms

PIR panels meet WHO GDP fire-policy; leak-free joints cut re-validation cycles, trimming ₹15 lakh annual compliance overheads.

Data-centre white-space

FM-approved PIR with 2-hr fire rating slots into modular pods; every 10 % envelope energy cut yields 1 % PUE improvement.

 

How to use the calculator

  1. Grab base rates. Enter your local steel/PIR quote (₹/sq ft) and current grid tariff.
  2. Choose build size & usage. The model autoscales HVAC tonnage and operating hours.
  3. Stress-test. Toggle interest rate, depreciation regime, or a 5 % energy-price CAGR.
  4. Compare scenarios. Print the summary tab for board approvals or lender due-diligence.

 

Final takeaways

  • Capex parity is a myth. Wall-roof packages are cheaper today, and full-facility prefabs close the gap once time and financing are priced in.
  • Operating cost edge is structural. Better U-values mean lower compressors, smaller gensets and thinner energy bills for decades.
  • Regulatory & ESG upside. ECBC, FSSAI, WHO-GDP and LEED credits all tilt towards high-performance envelopes.

 

Ready to model your own numbers?

Rinac’s in-house engineering team can preload your area, temperature band and subsidy scheme into the calculator and mail you a one-pager ROI sheet. Leave your email in the comments or ping [email protected], and we’ll spin it up in 24 hours.

© Copyright Rinac | All rights reserved | Designed and Developed by: Hyrrokkin